June 3 – Inspection of the Bulkhead along the Lake

During the week of June 3, the District Engineer for Fort Bend County MUD 46, LJA Engineering, will be performing an inspection of the bulkhead along the lake. The inspection will continue throughout the week with access mainly along the bulkhead. In some locations, representatives from LJA might contact specific homeowners for access in the event the bulkhead cannot be accessed along the top. The District is currently only aware of one issue along Spanish Bay Court but will be inspecting to confirm conditions for the entire lake. Even with the inspection, residents are encouraged to reach out the District via https://www.fbcmud46.org/contact/ to report any suspected bulkhead issues. Possible visual issues include soil erosion or depressions along the backside of the bulkhead or areas were the bulkhead is leaning toward the lake.